Gujarat: First 100m Span Of 2 X 100m Long Steel Bridge Launched Over NH-48 For Bullet Train Project

Felaket

New member
Gujarat: First 100m Span Of 2 X 100m Long Steel Bridge Launched Over NH-48 For Bullet Train Project The first span of the bridge was launched on the highway across the three lanes by sliding the span for about 200 m from one end.
 
Üst